Place of Origin: | Jiangsu,China |
Brand Name: | Changier |
Certification: | CE/ISO9001 |
Model Number: | DAF-105 |
Minimum Order Quantity: | Negotiation |
---|---|
Price: | Negotiation |
Packaging Details: | Wooden Box |
Delivery Time: | 45 Days |
Payment Terms: | L/C, T/T |
Supply Ability: | 1000 Units Per Year |
Color: | Siliver | Usage: | Wastewater Pre-Treatment |
---|---|---|---|
Type: | Advection Gas Floatation Machine | Function: | Remove Suspended Solids |
Flow Rate: | 1-300 CBM/hr | Weight: | To Different Types |
Highlight: | industrial wastewater treatment equipment,sewage plant equipment |
SS Removal Industry Water Treatment Dissolved Air Flotation Units DAF Machine
In the water treatment process, solid-liquid separation and its equipment are one of the key projects. Dissolved air flotation is one of the most effective methods whose specific gravity near than that of water.
DAF is a good new sewage separating and purifying equipment especially for separarting grease, jelly, and suspended solid in the in the industrial and city water by way of proportionately transforming the micro-bubbles into the water directly through specially-designed bulk gas impeller instead of adopting complex air-dissolved technology with features of no obstruction, economic and convenient operation.
· No circulating pump,air compresser,pressure vessel
· Save operation cost and area,save investment
· Simple,compact,maintenance free
· Especially suitable for oily wastewater treatment
Disposal of oily waste water treatment in petrochemical industry
Oily waste water treatment and reinjection water in oil exploitation industry
Disposal of slaughter waste water in meatpacking industry
Grease and effluent treatment in dairy industry
The treatment of effluents generated by the pulp and paper industries
Oily waste water treatment in machinery processing industry
Q:How to buy your idea products?
A:You can provide us your water sources, water quality, flow rate and ground area (connect us for more details).
Q:How to pay?
A:TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q:What is the delivery time?
A:It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
Q:How to pack the products?
A:We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
Q:How to keep your equipments from corrosion?
A:We use the world-famous paint, like SigmaCoatings,PainBow,etc. What's more, we paint strictly according to the standard process.
Q:How do you manufacture your equipment?
A:Our machining technology includes laser/plasma cutting, automatic welding,CNC cutting and bending.
Q:How to install after the equipments arriving destination?
A:We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
Contact Person: Ms. XUE JIANG(Hellen)
Tel: +86-18626067891